MNMS worked with IHI and SMCC Joint Venture in their Bangabandhu Railway Bridge Construction Project
in Sirajganj, Bangladesh.
Scope of Services: Land Equipment & Logistics Support using;
- Long Boom Excavator-1 (60 ft boom)
- Long Boom Excavator-2 (60 ft boom )
- Excavator/Dozer (incl. grab attachment)
- Long Trailer-01 (70 ft long)
- Long Trailer-02 (70 ft long)
- Lowbed Trailer (22 ft long)
- Backhoe (0.3 CUM)